Published: 13 December 2013

I am part of the integration team of the ALICE experiment and my role is to manage the volume in the tunnel and in the experimental cavern by using 3D CAD.

In 2013 I was involved in the following activities.

Installation of hatches for the access platform on the "I" side of L3 and various staircases in order to guarantee the best possible working conditions for various groups.

Study and follow-up of the manufacturing of supports for electrical racks in the SX2 building.

Design and follow-up of the manufacturing of mechanical equipment for the installation of beams for DCAL.

Finally, I was involved in the manufacturing of mechanical equipment for the installation of temporary counterweight during the LS1.